Installation method of CNC lathe


Release time:

2024-01-11

The lifting and positioning of the machine tool shall use the special lifting tools provided by the manufacturer, and other methods are not allowed. Special lifting tools are not required, and wire ropes shall be used to lift and place in accordance with the positions specified in the instructions.

Installation method of CNC lathe

Lifting and Transportation
The lifting and positioning of the machine tool shall use the special lifting tools provided by the manufacturer, and other methods are not allowed. Special lifting tools are not required, and wire ropes shall be used to lift and place in accordance with the positions specified in the instructions.
Foundation and location
The machine tool should be installed on a solid foundation, and the location should be far away from the vibration source; avoid sunlight and heat radiation; place it in a dry place to avoid the influence of humidity and airflow. If there is a vibration source near the machine tool, anti-vibration ditch shall be set around the foundation.
Installation of machine tools
The machine is placed on the foundation, should be in the free state of leveling, and then the anchor bolts evenly locked. For ordinary machine tools, the reading of the level shall not exceed 0.04/1000mm, and for high-precision machine tools, the level shall not exceed 0.02/1000mm. When measuring the installation accuracy, it should be carried out at a constant temperature, and the measuring tool should be used after a period of constant temperature. When installing the machine tool, we should try our best to avoid the installation method of forced deformation of the machine tool. When the machine tool is installed, some parts of the machine tool should not be removed casually. The removal of the parts may lead to the redistribution of the internal stress of the machine tool, thus affecting the accuracy of the machine tool.
Preparation before commissioning
After the geometric accuracy inspection of the machine tool is qualified, the whole machine needs to be cleaned. Use cotton cloth or silk cloth soaked with cleaning agent, and do not use cotton yarn or gauze. Clean the anti-rust oil or anti-rust paint applied to protect the guide surface and processing surface of the machine tool when leaving the factory. Clean the dust on the outer surface of the machine. All sliding surfaces and working surfaces shall be coated with lubricating oil as specified by the machine tool.
Carefully check whether each part of the machine tool is filled with oil as required and whether the cooling tank is filled with sufficient coolant. Whether the oil of the lubricating device in the hydraulic station and automatic room of the machine tool is at the position specified by the oil level instruction device.
Check whether the switches and components in the electrical control box are normal and whether the plug-in integrated circuit boards are in place.
Power-on start centralized lubrication installation, so that all lubrication parts and lubricating oil road are filled with lubricating oil. Do a good job in all parts of the machine before the action of all preparations.

Key words: